Projects

Our portfolio showcases the work we have undertaken, including construction supervision, road and bridge projects, hydropower projects, transmission line projects, feasibility studies, capacity development trainings, and many more.

Major Projects and Work Experiences

As a Multidisciplinary consulting firm, RIMC has wide range of experiences, major experiences on various field are listed below:

Ongoing Project 

  • Detailed Design and Construction Supervision of Ankhu Khola Hydropower Project (20MW), Ganesh Himal Hydropower Limited, Dhading District.
  • Field Based Regular Consultants for BRCRN Project through Firm at PPMUs (Sunsari, Mahottari & Sundhali) for up to April 2027, Contract No. Contract No. BRCRN/NCS/RFP/ QCBS/ 20280/081/Assaignment-01, GCF funded Project
  • Mobilization of PMU and PPMUs Based Consultants for BRCRN Project, Contract No. BRCRN/NCS/RFP/ QCBS/ 20280/081/Assaignment-02, GCF Funded Project 

Construction supervision, Quality Control and Monitoring

  • South Asia Sub-Regional Economic Cooperation (SASEC) Power System Expansion Project – Safeguard Implementation and Monitoring Works 220 KV Transmission Line Project (Contract No: ESSD-02-2073/074) under Nepal Electricity Authority (Environment and Social Studies Department)/ADB Funded, Completion Date- June 2024.
  • Electricity Transmission Expansion and Supply Improvement Project– Safeguard Monitoring and Implementation of Tamakoshi-Kathmandu 220/400 KV Transmission Line Project under Nepal Electricity Authority (Environment and Social Studies Department)/ADB Funded.
  • Detailed Design and Construction Supervision of Siddhikhola Hydropower Project (10MW) under Siddhi Khola Hydropower Company P. Ltd., Expected Completion Date- – Aug, 2024.
  • Detailed Design and Technical Support Consultant for Research and Training Center at Gajuri (SRCTIP-DOR-CS-QCBS-7) under Department of Roads, Foreign Cooperation Branch/World Bank Funded, Expected Completion Date- – May 2023.
  • Detailed design and Construction Supervision of TU Constituent Colleges (Central Campus Kirtipur (Boys Hostel and Memorial Hall), RECAST Building, Ayurbed Campus Kirtipur (Boys and Girl Hostel), Public Youth Campus and Teaching Hospital campus Hostel) under Central Level Implementation Project Unit (education), Ministry of Education/Exim Bank of India Funded, Expected Completion Date-July, 2025.
  • Design and Supervision consultant (Urban Road, Sewerage, Parks, River Trainings etcs) for Urlabari Municipality, Morang/ under Nepal Governance and Urban Improvement Project (NUGIP) under Urlabari Municipality/World Bank Funded, Expected Completion Date-June,2025.
  • Construction Supervision, Training (Stone Layer Mason (Level-1) Training: 70 youths in Dhading District and Construction Carpenter (Level-1) Training: 20 youths in Dhading District) and monitoring works of House Construction works under Skill for Reconstruction (SR) (1st Procurement 2015)/Employment Fund Secretariat/Helvetas-Nepal/Swiss Government Funded.
  • Construction Supervision, Training (Stone Layer Mason (Level-1) Training): 70 youths in Dhading District and Construction Carpenter (Level-1) Training: 20 youths in Dhading District) and Monitoring works of House Construction works under Skill for Reconstruction (SR) (2nd Procurement 2016)/Employment Fund Secretariat/Helvetas- Nepal/Swiss Government Funded.
  • Construction Supervision, Training (Stone Layer Mason (Level-1) Training): 70 youths in Dhading District and Construction Carpenter (Level-1) Training: 20 youths in Dhading District) and Monitoring works of House Construction works under Skill for Reconstruction (SR) (3rd Procurement 2017)/Employment Fund Secretariat/Helvetas-Nepal/Swiss Government Funded.
  • Construction Supervision, Training and Monitoring of Retrofitting works of 3 houses in Sindhuli district including 15 masons were trained under the On-the-Job module of training on retrofitting works under Employment Fund Secretariat (EFS) / HELVETAS Swiss Interco-operation Nepal/Swiss Government Funded.
  • Design and Supervision of Retrofit and toilet construction project i.e., Community and School Disaster Preparedness and Resilient (CSDPR) “School Building Retrofit and Toilet Construction Works of School Building, Kamchada, Doti under Community Development Centre (CDC).
  • Social Mobilization, Construction Supervision, Monitoring and Implementation of Trail Bridges (5nos) in Kalikot District under District Development Committee, Kalikot.
  • Social Mobilization, Construction Supervision, Monitoring and Implementation of Trail Bridges in Dailekh District under District Development Committee, Dailekh.
  • Preparation of Master Plan, Architectural Drawing / Design, Structural Design / Drawing, Interior Design / Drawing Electrical and Sanitary Design/Drawing and Cost Estimation, Landscaping design and construction supervision of ICA building under Institute of Cultural Affairs (ICA Nepal)/JICA Funded.
  • Provided Technical support on Conduction of on-the-Job Training for Mason at Nuwakot district (Construction and Supervision of Six Model house as per DUDBC guidelines) under OXFAM Nepal.

Transmission Line Projects

  • Implementation of Social Safeguards Monitoring works at Kaligandaki Corridor (Dana- Kusma) 220 kV Transmission Line Project in Project Affected Area at Parbat and Myagdi districts (includes preparation of Compensatory Plantation Plan (CPP), Nursery and Plantation Management Manual for different 11 Species, implementation of resettlement plan and other safeguard issues, Conducted of Forest and wildlife awareness program, community forest management training, non-timber forest cultivation training, Capacity Building training, Occupational Safety training, Skill Development training, Livestock training, Mushroom farming training, Micro Enterprises Creation Training and GESI Related issues.) under Nepal Electricity Authority (Environment and Social Studies Department)/ADB Funded.
  • Safeguard Implementation and Monitoring Works of South Asia Sub-Regional Economic Cooperation (SASEC) Power System Expansion Project- Marsyangdi Corridor, Marsyangdi Kathmandu Transmission Line Project 220KV (1st Phase) at Tanahun, Gorkha, Chitwan, Dhading, Kathmandu Districts (includes Monitoring Works and Safeguard Implementation Works: Various Capacity Development/Awareness Training Programs.) under Nepal Electricity Authority (Environment and Social Studies Department)/ADB Funded.
  • Supplementary Detail Survey and Design (including Cadastral Survey and Mapping) of Bheri Corridor 400 kV Transmission Line Project and Nalgad Substation under Rastriya Prasaran Grid Company.
  • Supplementary Detail Survey and Design (including Cadastral Survey and Mapping) of Bheri Corridor 400 kV Transmission Line Project and Nalgad Substation under Rastriya Prasaran Grid Company.
  • Safeguard Implementation and Monitoring Works of South Asia Sub-Regional Economic Cooperation (SASEC) Power System Expansion Project- Kaligandaki Corridor Dana-Kushma Transmission Line Project 220 KV (1st Phase) at Myagdi and Parbat Districts (includes Monitoring Works and Safeguard Implementation Works: Various Capacity Development/Awareness Training Programs.) under Nepal Electricity Authority (Environment and Social Studies Department)/ADB Funded.
  • Implementation of Environmental Safeguards Monitoring works at Marsyangdi- Kathmandu 220 kV TL Project at Gorkha, Chitwan, Dhading and Kathmandu districts includes preparation of Compensatory Plantation Plan (CPP), Nursery and Plantation Management Manual for different 11 Species, implementation of resettlement plan and other safeguard issues, Conducted of Forest and wildlife awareness program, community forest management training, non-timber forest cultivation training, Capacity Building training, Occupational Safety training, Skill Development training, Livestock training, Mushroom farming training, Micro Enterprises Creation Training and GESI Related issues.) under Nepal Electricity Authority (Environment and Social Studies Department)/ADB Funded.
  • Electricity Transmission Expansion and Supply Improvement Project– Safeguard Monitoring and Implementation of Tamakoshi-Kathmandu 220/400 KV Transmission Line Project/ ADB Funded.
  • Detailed Design and Construction Supervision of Siddhikhola Hydropower Project (10MW) including Detailed Survey and Design of Transmission Line (18km) including Cadastral Survey and Mapping, Expected Completion Date- Aug 2024.

Cadastral Survey and Mapping Works

  • Initial Environmental Examination (IEE) study and Detailed Cadastral Survey with Mapping of West Seti Transmission Line Project under RPGCL
  • Design and Supervision Consultant (Urban Road, Sewerage, Parks, River Trainings etcs) for Urlabari Municipality, Morang/ under Nepal Governance and Urban Improvement Project (NUGIP) under Urlabari Municipality/World Bank Funded (includes Detailed Survey of the Road Corridor, Cadastral Survey and Mapping,Identificaton of ROW of Road).
  • Supplementary Detail Survey and Design (including Cadastral Survey and Mapping) of Bheri Corridor 400 kV Transmission Line Project and Nalgad Substation under Rastriya Prasaran Grid Company Ltd.
  • Detail Engineering Survey of Rerouted Sections and Tower Spotting/Tower Scheduling, BoQ Preparation and Cost Estimation of Bheri Corridor 400 kV Transmission Line Project, (NCB/RPGCL/RPF/077-78/02) including Land Acquisition Survey and overlay on Cadastral Map of Route, 45 Km under Rastriya Prasaran Grid Company Ltd.
  • Detailed Design and Construction Supervision of Siddhikhola Hydropower Project (10MW) including Detailed Survey and Design of Transmission Line (18km) including Cadastral Survey and Mapping.
  • Feasibility Study, Detailed Engineering Survey, Cadastral Survey and Mapping, Detailed Design, Estimate and ESMP of Bhojpur – Manebhanjyang – Ranibas – Ghoretar Road 10 DR02 (Chainage 29+000 to Chainage 47+800).
  • Detailed Engineering Survey, Detailed Design, Land Acquisition Survey and overlay on cadastral map of Roads, Report Preparation (DPR) and Construction Supervision of Roads at Dailekh Bazar – Gamaudi – Dullu Bazar (Total Road length – 25 km) of Dailekh District.
  • Detailed Engineering Survey, Detailed Design, Land Acquisition Survey and overlay on cadastral map of Roads and Report Preparation (DPR) of Budhgandaki Hydropower Reservoir Ring Road, Dhading Section (100km).
  • Detailed Engineering Survey, Detailed Design, Land Acquisition Survey and overlay on cadastral map of Roads and Report Preparation (DPR) of Janakpur- Kaptaul- TinKauriya Road, Dhanusha (22km).
  • Detailed Engineering Survey, Detailed Design Report Preparation (DPR), Land Acquisition Survey and overlay on cadastral map of Roads (Bhardaha- Kanchanpur- Balan, Saptari (46.580km), Balan- Kamala, Siraha Section (00km), Kamala- Janakpur- Babhitta, Dhanusha Section (43.223km) and Basbhitta- Parol- Haldi Mahottari Section (32.658km) under Postal Highway Project, Department of Roads.
  • Detailed Engineering Survey, Detailed Design Report Preparation (DPR), Land Acquisition Survey and overlay on cadastral map of Shivpuri Agricultural Ring Road (CH 40+000 to 70+000),

Building projects

  • Preparation of Detailed Project Report for Urban Regeneration in Historical Settlements of Dhulikhel Municipality (Ref No.:01/DPR/UR/TDF/MFCB/079/80), Expected Completion date: Dec,
  • Detailed Topographic Survey, Geotechnical Investigation (Soil Drilling Works, Lab Test and Preparation of Geotechnical Reports), Detailed Design and Technical Support Consultant for Research and Training Center at Gajuri (SRCTIP-DOR-CS- QCBS-7) /World Bank Funded, Expected Completion Date- – May 2023.
  • Detailed Topographic Survey, Geotechnical Investigation (Soil Drilling Works, Lab Test and Preparation of Geotechnical Reports), Detailed design and Construction Supervision of TU Constituent Colleges (Central Campus Kirtipur (Boys Hostel and Memorial Hall), RECAST Building, Ayurbed Campus Kirtipur (Boys and Girl Hostel), Public Youth Campus and Teaching Hospital campus Hostel)/Exim Bank of India Funded, Expected Completion Date-July, 2025.
  • Preparation of Master Plan, Detailed Topographic Survey, Geotechnical Investigation (Soil Drilling Works, Lab Test and Preparation of Geotechnical Reports) and Preparation of Detail Project Report of Manamohan Technical University/GON Funded.
  • Design and Supervision of Retrofit and toilet construction project i.e., Community and School Disaster Preparedness and Resilient (CSDPR) “School Building Retrofit and Toilet Construction Works of School Building, Kamchada, Doti under Community Development Centre (CDC).
  • Preparation of Master Plan, Detailed Architectural Design, Structural Design, Drawings, Interior Design, Electrical and Sanitary Design and Drawing, Interior Design, Electrical and Sanitary Design and Drawing, Cost Estimate and Bidding Documents of Hostel Block of Kathmandu Medical College at Duwakot, Bhaktapur, Nepal under Kathmandu Medical College Public Limited and Teaching Hospital, Attarkhel, Kathmandu.
  • Detail Seismic Vulnerability Assessment, Retrofit Design, Preparation of Working Drawings and Cost Estimation of Hospital Building of Nepal Medical College at Jorpati, Kathmandu, Nepal under Kathmandu Medical College Public Limited and Teaching Hospital, Attarkhel, Kathmandu.
  • Detail Seismic Vulnerability Assessment, Retrofit Design, Preparation of Working Drawings and Cost Estimation of Main Hospital Building of Kathmandu Medical College at Sinamangal, Kathmandu, Kathmandu Medical College Public Limited and Teaching Hospital,Sianmangal Kathmandu.
  • Preparation of Master Plan, Detailed Architectural Design, Structural Design, Drawings, Interior Design, Electrical and Sanitary Design and Drawing, Interior Design, Electrical and Sanitary Design and Drawing, Cost Estimate of OPD Building of Nepal Medical college and Teaching Hospital at jorpati, Kathmandu, Nepal under Nepal Medical college and Teaching Hospital, Gokarneshwor Municipality, Ward No.-15, Jorpati, Kathmandu.
  • Detail Seismic Vulnerability Assessment , Retrofit Design, Preparation of Working Drawings and Cost Estimation of Dental Nursing College Building of Kathmandu Medical College at Duwakot, Bhaktapur, Nepal under Kathmandu Medical College, Duwakot, Bhaktapur, Nepal.
  • Preparation of Master Plan, Detailed Architectural Design, Structural Design, Drawings, Interior Design, Electrical and Sanitary Design and Drawing, Interior Design, Electrical and Sanitary Design and Drawing, Cost Estimate of college building of Nepal Medical college and Teaching Hospital at Kathmandu, Nepal under Nepal Medical college and Teaching Hospital, Sinamangal, Kathmandu, Nepal.
  • Detail Seismic Vulnerability Assessment, Retrofit Design, Preparation of Working Drawings and Cost Estimation of Administration Block of People’s Dental College and Hospital Pvt. Ltd. at Nayabajar, Kathmandu, Nepal under People’s Dental College and Hospital Pvt. Ltd., Nayabazar, Kathmandu.
  • Detail Seismic Vulnerability Assessment , Retrofit Design, Preparation of Working Drawings and Cost Estimation of Basic Science Complex Building of Kathmandu Medical College at Duwakot, Bhaktapur, Nepal under Kathmandu Medical College, Duwakot, Bhaktapur, Nepal,
  • Preparation of Master Plan, Detailed Architectural Design, Structural Design, Drawings, Interior Design, Electrical and Sanitary Design and Drawing, Interior Design, Electrical and Sanitary Design and Drawing, Cost Estimate and Bidding Documents of P.N. Pant Memorial Teaching Hospital at Sinamangal of Kathmandu Medical College Public Limited and Teaching Hospital, Sinamangal, Kathmandu, Nepal under Kathmandu Medical College Public Limited and Teaching Hospital, Sinamangal, Kathmandu, Nepal.
  • Provided Technical support on Conduction of on-the-Job Training for Mason at Nuwakot district (Construction and Supervision of Six Model house as per DUDBC guidelines) under OXFAM Nepal.
  • Preparation of Master Plan, Detailed Architectural Design, Structural Design, Drawings, Interior Design, Electrical and Sanitary Design and Drawing, Cost Estimate and Bidding Documents of New purposed hospital Building of Kathmandu Medical College Public Limited and Teaching Hospital, Duwakot Bhaktapur, Nepal under Kathmandu Medical College, Sinamangal, Kathmandu, Nepal, (2018).
  • Detailed Project Report (DPR) for Construction of Primary Hospital (15 Bed) of Hatuwagadhi Rural Municipality, Bhojpur under Office of Rural Municipal Executive, Hatuwagadhi Rural Municipality.
  • Preparation of Master Plan, Architectural Drawing / Design, Structural Design / Drawing, Interior Design / Drawing Electrical and Sanitary Design/Drawing and Cost Estimation, Landscaping design and construction supervision of ICA building under Institute of Cultural Affairs (ICA Nepal)/JICA Funded.

Roads/Bridge Projects

  • Detailed Engineering Survey, Detailed Design and Report Preparation (DPR) of Rural Roads from Bharta to Sukatiya VDC of Kalikot Districts (5 km).
  • Detailed Engineering Survey, Detailed Design and Report Preparation (DPR) of Shivpuri Ring Road (30km).
  • Design and Supervision Consultant (Urban Road, Sewerage, Parks, River Trainings etcs) for Urlabari Municipality, Morang/ under Nepal Governance and Urban Improvement Project (NUGIP) under Urlabari Municipality/World Bank Funded (includes Detailed Survey of the Road Corridor, Cadastral Survey and Mapping,Identificaton of ROW of Road), Expected Completion Date-June,2025.
  • Feasibility Study, Detailed Engineering Survey, Cadastral Survey and Mapping, Detailed Design, Estimate and ESMP of Bhojpur – Manebhanjyang – Ranibas – Ghoretar Road 10 DR02 (Chainage 29+000 to Chainage 47+800).
  • Detailed Engineering Survey, Design, Drawing and Report Preparation of Matela – Kaphla – Budiyachaur – Pokhara – Khalanga Road(5 Km), Jhapra, Khalanga VDC, Jajarkot.
  • Detailed Engineering Survey, Design, Drawing and Preparation of Detail Project Report (DPR) of Holeri- Gwarkhola Tulsipur Sadak (5km.
  • Detailed Engineering Survey, Detailed Design and Report Preparation (DPR) of Motorable Bridge over Ritthe Khola at Jajarkot District. (18m RCC Simply Supported).
  • Detailed Engineering Survey, Detailed Design, Land Acquisition Survey and overlay on cadastral map of Roads, Report Preparation (DPR) and Construction Supervision of Roads at Dailekh Bazar – Gamaudi – Dullu Bazar (Total Road length – 25 km) of Dailekh District.
  • Detailed Engineering Survey, Detailed Design, Land Acquisition Survey and overlay on cadastral map of Roads and Report Preparation (DPR) of Budhgandaki Hydropower Reservoir Ring Road, Dhading Section (100km).
  • Detailed Engineering Survey, Detailed Design and Report Preparation (DPR) and Construction Supervision of Rural Roads from Seri – Pantadhi Road Project (road length -25km) of Kalikot Districts.
  • Feasibility Study and Detailed Engineering Survey, Design, Cost Estimate, Report Preparation and Construction Supervision of Access Road (20 Km) of Pikhuwa Khola Small Hydropower Project (2.5 MW) Paluwa VDC, Bhojpur District.
  • Social Mobilization, Construction Supervision, Monitoring and Implementation of Trail Bridges (5nos) in Kalikot District under District Development Committee, Kalikot. (2014).
  • Social Mobilization, Construction Supervision, Monitoring and Implementation of Trail Bridges (3nos.) in Dailekh District under District Development Committee, Dailekh.
  • Detailed Engineering Survey, Detailed Design, Land Acquisition Survey and overlay on cadastral map of Roads and Report Preparation (DPR) of Janakpur- Kaptaul- TinKauriya Road, Dhanusha (22km).
  • Detailed Engineering Survey, Detailed Design Report Preparation (DPR), Land Acquisition Survey and overlay on cadastral map of Roads (Bhardaha- Kanchanpur- Balan, Saptari (580km), Balan- Kamala, Siraha Section (30.00km), Kamala- Janakpur- Babhitta, Dhanusha Section (43.223km) and Basbhitta- Parol- Haldi Mahottari Section (32.658km) under Postal Highway Project, Department of Roads.
  • Detailed Engineering Survey, Detailed Design Report Preparation (DPR), Land Acquisition Survey and overlay on cadastral map of Shivpuri Agricultural Ring Road (CH 40+000 to 70+000),
    • Detailed Engineering Survey, Detailed Design, Land Acquisition Survey and overlay on cadastral map of Roads and Report Preparation (DPR) of Janakpur- Kaptaul- TinKauriya Road, Dhanusha (22km).
    • Detailed Engineering Survey, Detailed Design Report Preparation (DPR), Land Acquisition Survey and overlay on cadastral map of Roads (Bhardaha- Kanchanpur- Balan, Saptari (46.580km), Balan- Kamala, Siraha Section (30.00km), Kamala- Janakpur- Babhitta, Dhanusha Section (43.223km) and Basbhitta- Parol- Haldi Mahottari Section (32.658km) under Postal Highway Project, Department of Roads.
    • Detailed Engineering Survey, Detailed Design Report Preparation (DPR), Land Acquisition Survey and overlay on cadastral map of Shivpuri Agricultural Ring Road (CH 40+000 to 70+000),30km.

Capacity Development Training

  • Capacity Building Training to Technical Staffs(sub-engineer and assistant sub engineers) and Representatives of local level Governments in Earthquake affected districts(Mainstreaming of Disaster Management within Construction Works) – Contract ID No.: EHRP-MDTF/NRA/S/CQS-04/2077-78 (MDTF Gr.No.TF-A4783.
  • 7 days Head Mason Training in Earthquake Resistant Building Construction (18 events/360nos. at Bhojpur (Salpasilicho Rural Municipality), Khotang (Rupakot Majhuwagadhi Municipality, Sakela Rural Municipality, Jantadhunga Rural Municipality), Solukhumbu (Necha Rural Municipality, Likhupk Rural Municipality) Central Level Project Implementation Unit/ Ministry of Urban Development (Various Donor Agencies Funding)
  • Conducted 7 days Head Mason Training (Total 18 events 360 Trainees) at Myagdi, Baglung, Parbat, Syangja and Kaski districts Under Central Level Project Implementation Unit/ Ministry of Urban Development (Various Donor Agencies Funding).
  • Conducted 7 days Head Mason Training in earthquake resilient occupations at Sindhuli District under Employment Fund Helvetas/DFID/Swiss Government Funded.
  • Conducted 7 days Head Mason Training for skill Development in earthquake resilient occupations at Rasuwa District (2 lots/20nos in Thulogaun VDC) under Group of Helping Hands (SAHAS) Nepal.
  • Construction Supervision, Training (Stone Layer Mason (Level-1) Training: 70 youths in Dhading District and Construction Carpenter (Level-1) Training: 20 youths in Dhading District) and monitoring works of House Construction works under Skill for Reconstruction (SR) (1st Procurement 2015)/Employment Fund Secretariat/Helvetas-Nepal/Swiss Government Funded.
  • Construction Supervision, Training (Stone Layer Mason (Level-1) Training): 70 youths in Dhading District and Construction Carpenter (Level-1) Training: 20 youths in Dhading District) and Monitoring works of House Construction works under Skill for Reconstruction (SR) (2nd Procurement 2016)/Employment Fund Secretariat/Helvetas- Nepal/Swiss Government Funded.
  • Construction Supervision, Training (Stone Layer Mason (Level-1) Training): 70 youths in Dhading District and Construction Carpenter (Level-1) Training: 20 youths in Dhading District) and Monitoring works of House Construction works under Skill for Reconstruction (SR) (3rd Procurement 2017)/Employment Fund Secretariat/Helvetas-Nepal/Swiss Government Funded.
  • Construction Supervision, Training and Monitoring of Retrofitting works of 3 houses in Sindhuli district including 15 masons were trained under the On-the-Job module of training on retrofitting works under Employment Fund Secretariat (EFS) / HELVETAS Swiss Interco-operation Nepal/Swiss Government Funded.
  • Implementation of Short Training Courses on Professional Cook (87 Trainees) at Kathmandu under ENSSURE Project/ World Bank Funded.
  • Implementation of Short Training Courses on Professional Cook (53 Trainees) at Kathmandu under ENSSURE Project/ World Bank Funded.
  • Implement Target Poverty Alleviation Program (Developing Mobilization manuals of livestock pocket and farmers groups/co-operatives) in 4 VDCs (Alau, Birgunj, Sub-Metropolitan city, Lakhanpur, and Lappers ) of Parsa District (Micro Financing Training, Pickle Making and Fruit Processing Training, Livestock (Level-1) under Poverty Alleviation PAF, Kathmandu/World Bank Funded.
  • Implement Target Poverty Alleviation Program (Developing Mobilization manuals of livestock pocket and farmers groups/co-operatives) in 7 VDCs (Bangesal, Damri, Khawang, Ligha, Lung, Phopli, Syauliwang) of Pyuthan District (Micro Financing Training, Pickle Making and Fruit Processing Training, Livestock (Level-1) Training) under Poverty Alleviation PAF, Kathmandu/World Bank Funded.
  • Training and Employment (Provided Path to Prosperity training to 308 persons on: Building Electrician- to 21 persons in Achham, Construction of carpenter- to 41 persons in Achham and Bajhang,Furniture Maker – to 40 persons in Achham and Bajhang,Stone layer Mason- to 80 persons in Achham and Bajhang,Sweets and Snacks Maker- to 20 persons in Achham ,Tailoring (Dress Making)- to 106 persons in Achham and Bajhang and
  • Result Based Short Term Training (RBST) at Jhapa and Morang districts (Building Electrician (Level-1) training: 100 youths in Jhapa District, Building Electrician (Level-1) training: 20 youths in Morang District, Off Season Vegetable Producer (Level-1) training: 120 youths in Jhapa District and Off Season Vegetable Producer (Level-1) training: 60 youths in Morang District under Enhanced Vocational Education and Training (EVENT), Ministry of Education/World Bank Funded.
  • Result Based Short Term Training & Employment (RBST) (Bardiya, Kailali and Kanchanpur districts) – Building Electrician (Level-1) training: 160 youths in Kailali and Kanchanpur Districts, Mason (Level-1) training: 60 youths in Kailali and Kanchanpur Districts, Tailoring (Level-1) training: 80 youths in Kailali and Kanchanpur Districts and Business promotion skills, business plan, entrepreneurship under Enhanced Vocational Education and Training (EVENT-II), Ministry of Education/World Bank Funded.
  • Result Based Short Term Training and Employment (RBST) / Nepal (2nd Round) (Banke, Bardiya and Kailali Districts)- Provided Micro- Enterprise for Job Creation training (Construction Carpenter (Level-1) training: 60 youths in Kailali, Banke and Bardiya Districts, Mason (Level-1) training: 20 youths in Kailali District and Junior Plumber (Level-1) training: 20 youths in Kailali District) and Life Skill Training – 5 days (Business promotion skills, business plan, entrepreneurship, Health & nutrition, HIV-AIDS awareness training, Saving & credit training and Skill-based sanitation and hygiene training) under Enhanced Vocational Education and Training (EVENT-II), Ministry of Education/World Bank Funded.
  • Result Based Short Term Training and Employment (RBST) / Nepal Banke, Bardiya, Kailali and Kanchanpur districts)- RIMC has implemented and concluded the above mentioned contract for training and employment on outcome based modality payment in Banke, Bardiya, Kailali and Kanchanpur Districts of Mid and Far Western Development region of Nepal to 300 persons on; Mason (Level-1) training: 160 youths in Banke, Bardiya, Kailali and Kanchanpur districts, Building Electrician (Level-1) training: 60 youths in Banke, Bardiya, Kailali and Kanchanpur districts, Tailoring (Level-1) training: 80 youths in Banke, Bardiya, Kailali and Kanchanpur districts and Business promotion skills, business plan, entrepreneurship under Enhanced Vocational Education and Training (EVENT), Ministry of Education/World Bank Funded.
  • Result Based Short Term Training (RBST) (Jhapa district)- RIMC has implemented and concluded the above mentioned contract for training and employment on outcome based modality payment in Jhapa District of Eastern Development region of Nepal. Provide the Plumbing and Off Season Vegetable Producer training as well as business promotion skills, business plan, entrepreneurship, business registration in district cottage industries for business promotion, life skills and more (Plumbing (Level-1) training: 20 youths in Jhapa District and Off Season Vegetable Producer (Level-1) training: 60 youths in Jhapa District) under Enhanced Vocational Education and Training (EVENT), Ministry of Education/World Bank Funded.
  • Result Based Short Term Training and Employment (RBST) / Nepal (3rd Round) (Khotang, Udayapur and Jhapa Districts)- Provided Micro- Enterprise for Job Creation training (Junior Plumber (Level-1) training: 40 youths in Jhapa and Khotang Districts, Stone Layer Mason (Level-1) training: 60 youths in Khotang and Udayapur Districts and Tailoring (Level-1) training: 40 youths in Khotang District) and Life Skill Training – 5 days (Business promotion skills, business plan, entrepreneurship, Health & nutrition, HIV-AIDS awareness training, Skill-based sanitation and hygiene training) under Enhanced Vocational Education and Training (EVENT III ), Ministry of Education/World Bank Funded.
  • Construction Supervision, Training and Monitoring of Retrofitting works of 3 houses in Sindhuli district including 15 masons were trained under the On-the-Job module of training on retrofitting works under Employment Fund Secretariat (EFS) / HELVETAS Swiss Interco-operation Nepal/Swiss Government Funded.
  • Voucher Based Short Term Training (VBST) at Kathmandu District (Indian Cook (Level-1) training: 40 youths, Waiter (Level-1) training: 20 youths) under Enhanced Vocational Education and Training (EVENT), Ministry of Education/World Bank Funded.
  • Training and Employment (Provided Micro- Enterprise for Job Creation training on –Construction trade group-10 person and Electrical and Electronics group- to 20 persons) at Achham, Bajhang and Jhapa districts under Employment Fund Secretariat (EFS), Helvetas-Nepal/Swiss Government Funded.
  • Building Civil Society through Facilitative Participatory Planning, Promoting Human Rights and Community Development Activities (Undertook the trainings in Bajhang and Baitadi District of Far Western Nepal: Computer Repair (Level-1) training in Bajhang: 40 Beneficiaries, Mobile Phone Repair (Level-1) training in Bajhang : 40 Beneficiaries, Livestock (Level-1) Training in Baitadi: 40 Beneficiaries, Basic Welding (Level-1) training in Baitadi: 40 Beneficiaries) under Institute of Cultural Affairs (ICA-Nepal),
  • Livelihood Enhancement Training Program in Kanchanpur, Dadeldhura and Bajhang District of Far Western Nepal (RIMC undertook the three different trainings in Kanchanpur, Dadeldhura and Bajhang District of Far Western Nepal:Welding (Level-1) training in Kanchanpur and Dadeldhura: 40 Beneficiaries,Tailoring (Level-1) training in Kanchanpur, Dadeldhura and Bajhang : 60 Beneficiaries and Village Level Animal Health Worker (Level-1) Training in Dadeldhura and Bajhang : 40 Beneficiaries) under Institute of Cultural Affairs (ICA-Nepal).
  • Supervision, Training (15 masons were trained under the On-the-Job module of training on retrofitting works) and Monitoring of Retrofitting works of 3 houses in Sindhuli district under Employment Fund Secretariat (EFS) / HELVETAS Swiss Interco-operation Nepal/ Swiss Government Funded.
  • Mason Training for Conflict Affected to Persons and Families at Rukum, Salyan and Dang Districts (Mason (Level-1) training: 60 trainees in Dang District, Mason (Level-1) training: 80 trainees in Salyan District and Mason (Level-1) training: 80 trainees in Rukum District) under Ministry of Peace and Reconstruction/ EPSP (Emergency Peace Support Project)/World Bank Funded.
  • Micro Enterprise for Job Creation and Path to Prosperity (Off Season Vegetable Producer (Level-1) training: 40trainees in Jhapa District, Off Season Vegetable Producer (Level-1) training: 60 youths in Saptari District) under Ministry of Peace and Reconstruction/ EPSP (Emergency Peace Support Project)/World Bank Funded.
  • Enterprise Development Training (Biratnagar, Nepalgunj, Butwal, Kathmandu, Dhangadi, Pokhara, Bhaktapur, Birtamode, Janakpur, Sarlahi, Surkhet, Dolakha, Itahari and Birgunj)- Packages and practices of microenterprise trainings to all, Jewelry Making Trainings – 240 in Biratnagar, Nepalgunj, Butwal, Kathmandu, Dhangadi, Pokhara,Handicraft Related Goods Trainings – 120 in Pokhara, Kathmandu, Bhaktapur,Mushroom Farming Trainings – 80 in Birtamode, Janakpur, Sarlahi,Handwoven carpet Trainings – 100 in Surkhet, Dolakha, Pokhara,Shoe Making Trainings – 180 in Kathmandu, Itahari, Birgunj, Nepalgunj, Dhangadi,Creation of micro enterprise development, Business promotion skills, business plan to all the participants under Nepal Chamber of Commerce.
  • Conduction of On the job Training for Mason at Nuwakot District (conducted 6 numbers of 50 days on the job training to train 94 new masons as per the approved curriculum of CTEVT on earthquake resistant construction technology) under Oxfam Nepal/Donor Funded.
  • 7 Days Mason Training on Earthquake Resilient Building Construction Techniques (8 Groups@20 Persons=160nos) as per DUDBC Curriculum under Rotary Club of Rudramati Kathmandu.
  • Livelihood Enhancement Skill Training (LEST) (Vocational Training) at Sindhupalchowk District (Beautician (Level-1) training: 13 Beneficiaries, Facilitation on Business promotion skills, business plan, entrepreneurship to 13 trainees) under Rural Reconstruction and Rehabilitation Sector Development Program (RRRSDP) Sindhupalchowk/ADB Funded.
  • Livelihood Enhancement Skill Training (LEST) (Vocational Training) at Sindhupalchowk District (Beautician (Level-1): 19 Beneficiaries , Computer (Level-1) : 25 Beneficiaries, Light Vehicle Driving (Level-1): 31 Beneficiaries, Veterinarian (Level-1): 12 Beneficiaries, Facilitation on Business promotion skills, business plan, entrepreneurship to 13 trainees) under Rural Reconstruction and Rehabilitation Sector Development Program (RRRSDP) Sindhupalchowk/ADB Funded.
  • Livelihood Enhancement Skill Training (LEST) (Vocational Training) at Jhapa District (Bamboo Interior Decoration Training (Level-1): 10 Beneficiaries, Plumbing Training(Level-1): 13 Beneficiaries , Building Electrician Training (Level- 1): 13 Beneficiaries, Saving & Credit Training (Level-1): 21 Beneficiaries, Household Biogas Plant Training (Level-1): 21 Beneficiaries) under Rural Reconstruction and Rehabilitation Sector Development Program (RRRSDP) Sindhupalchowk/ADB Funded.
  • Skill Development Training Program (Vocational Training) at Dailekh and Ilam district (provide training on various aspects of agriculture sectors to 125 rural farmers of 18 VDCs in Dailekh district & 4 VDCs in Ilam district and Facilitating in the Micro Enterprise Development) under Youth & Small Enterprise Self Employment Fund, Ministry of Finance/GON Funded.
  • Micro Enterprise for Job Creation and Path to Prosperity (Path to Prosperity training to 200 persons on:1. Building Electrician- to 21 persons, 2. Construction of carpenter- to 41 persons, 3. Stone layer Mason- 40 persons in Achham and Bajhang,4. Tailoring (Dress Making)- 66 persons in Achham and Bajhang. Provided Micro- Enterprise for Job Creation training to 30 persons on –1. Construction trade group-10 persons in Jhapa,2. Electrical and Electronics group- to 20 persons in Jhapa) at Achham, Bajhang and Jhapa District under Employment Fund Helvetas/Swiss Government Funded.
  • Promotion of improved cooking stoves (ICS) in Parbat and Bajhang district under Institute of cultural affairs (ICA-Nepal),
  • Livelihood Enhancement Skill Training (LEST) in Lalitpur District (include Tailoring (Level-1) training: 8 Beneficiaries, Cook (Level-1) training: 9 Beneficiaries and Light Vehicle Driving (Level-1) training: 17 Beneficiaries) under Rural Reconstruction and Rehabilitation Sector Development Program (RRRSDP), DDC Lalitpur.
  • Livelihood Enhancement Skill Training (LEST) in Jhapa District (include Bamboo Interior Decoration Training (Level-1): 10 Beneficiaries, Plumbing Training (Level-1):13 Beneficiaries, Building Electrician Training (Level-1): 13 Beneficiaries, Candle Making Training (Level-1):21 Beneficiaries and Saving & Credit Training (Level-1): 21 Beneficiaries) under Rural Reconstruction and Rehabilitation Sector Development Program (RRRSDP), DDC Jhapa.
  • Building Civil Society Through Facilitative Participatory Planning, Promoting Human Rights and Community Development Activities at Doti and Bajhura District (includes Mason Training (Level-1): 35 Youth, Plumbing Training(Level-1):20 Youth and Agriculture Training (Level-1):53 Youth) under Institute of Cultural Affair, Nepal.
  • Building Civil Society Through Facilitative Participatory Planning, Promoting Human Rights and Community Development Activities at Baitadi and Dadeldhura District (Mason Training (Level-1): 21 Youth in Baitadi district, Plumbing Training(Level-1): 21 Youth in Baitadi district, Building Electrician (Level-1): 28 Youth in Dadeldhura and Baitadi district, Agriculture Training (Level-1):31 Youth in Dadeldhura and Baitadi district, Beautician Training (Level- 1): 33 Youth in Dadeldhura district, Cook and Waiter Training (Level-1): 37 Youth in Dadeldhura district) under Institute of Cultural Affair, Nepal.
  • Building Civil Society Through Facilitative Participatory Planning, Promoting Human Rights and Community Development Activities at Dadeldhura and Baitadi districts (Provided Micro- Enterprise and life skill for Job Creation training: Mason training in Baitadi: 21 Beneficiaries for 2 months ,Plumber training in Baitadi: 21 Beneficiaries for 3 months,Building Electrician in Dadeldhura/ Baitadi :28 Beneficiaries for 2 months, Agricultural training in Dadeldhura/ Baitadi :31 Beneficiaries for 2months,Beautician training in Dadeldhura:33 Beneficiaries for 3 months, Cook and Waiter training in Dadeldhura : 37 Beneficiaries for 3 months and Health and safety Awareness Training Dadeldhura / Baitadi:72 Beneficiaries for 1 month)under Institute of Cultural Affair, Nepal.

Preparation of Master Plan/DPR of Infrastructures, Capacity Development Plan, Revenue Plan etc.

  • Preparation of Detailed Project Report for Urban Regeneration in Historical Settlements of Dhulikhel Municipality (Ref No.:01/DPR/UR/TDF/MFCB/079/80), Expected Completion Date: Dec,
  • Preparation of Periodic Plan of Local Governments, RFP No.: NCB/Consulting/RFP/Periodic Plan/Cluster-2 [(a) Jugal Rural Municipality, Sindhupalchowk (b) Lisankhupakhar Rural Municipality, Sindhupalchowk (c) Helambu Rural Municipality, Sindhupalchowk and (d) Bhaktapur Municipality, Bhaktapur] Provincial Center for Good Governance (PCGG)/ Bagmati Province/Swiss Government Funded,
  • Preparation of Capacity Development Plan of Local Governments, RFP No.: NCB/Consulting/RFP/CD/Cluster-3((a) Banepa Municipality, Kavrepalanchok (b) Panauti Municipality, Kavreplanchowk (c) Rapti Municipality, Chitwan (d) Bakaiya Rural Municipality, Makawanpur (e) Bagamati Rural Municipality, Makawanpur (f) Godawari Municipality, Lalitpur (g) Bagamati Rural Municipality, Lalitpur (h) Dhunibeshi Municipality, Dhading and (i) Siddhalek Rural Municipality Dhading) under Provincial Center for Good Governance (PCGG)/ Bagmati Province/Swiss Government Funded,
  • Preparation of Capacity Development Plan of Local Governments, RFP No.: NCB/Consulting/RFP/CD/Cluster-2((a) Melamchi Municipality, Sindhupalchowk (b) Bethanchowk Rural Municipality, Kavreplanchowk (c) Indrawoti Rural Municipality, Sindhupalchowk (d) Sailung Rural Municipality, Dolakha (e) Bhotekoshi Rural Municipality, Sindhupalchowk (f) Panchkhal Municipality, Kabhreplanchowk (g) Namobuddha Municipality, Kabhreplanchowk (h) Mahabharat Rural Municipality, Kabhreplanchowk and (i) Tripurasundari Rural Municipality Sindhupalchowk) under Provincial Center for Good Governance (PCGG)/ Bagmati Province/Swiss Government Funded,
  • Master Plan of Tourism, Hatuwagadhi Rural Municipality, Ghodetar, Bhojpur,
  • Preparation of Periodic District Development Plan of Salyan District under District Development Committee Salyan.
  • Preparation of District Development Plan (DDP) of Jhapa District under District Development Committee Jhapa,
  • Preparation of Local Adaption Plan of Action (LAPA) of Five VDCs in Bardiya district under Office of District Development Committee, Bardiya.
  • Preparation of Local Adaption Plan of Action (LAPA) of Five VDCs (Laha, Dhime, Arcchani, Suwanauli and Pajaru) in Jajarkot district under Office of District Development Committee Jajarkot.
  • Preparation of Local Adaption Plan of Action (LAPA) of Five VDCs (Gam, Seuri, Mijhing, Pang and, Tebang) in Rolpa district under Office of District Development Committee Rolpa.
  • Preparation of Disaster Management Plan and GESI Plan of Naumule Rural Municipality under Office of Naumule Rural Municipality Dailekh District.
  • Preparation of Disaster Management Plan of Arun III Hydroelectric Project Area under SJVN Arun-III Power Development Company (SAPDC) Private Limited.
  • Preparation of Master Plan of Detail Project Report of Darbaha Hat Bazaar and Cold Store Building, Darbaha, Kapilvastu under Suddodhan Rural Municipality Kapilvastu.
  • Preparation of Nepal Industrial Benefit Plan (Sankhuwasabha, Bhojpur, Taplejung, Dhankuta, Khotang, Morang and Sunsari district) under SJVN Arun-III Power Development Company (SAPDC) Private Limited.
  • Preparation of the Industrial Benefits Plan for Butwal- Bhairahawa industrial corridor in partnership with Butwal Chamber of Commerce and Industry under Gharelu Tatha Sana Udhyog Bikash Samiti Nawalparasi.
  • Preparation of Detail Project Report (Master Plan, Detail Design and Drawings, Quantity and Cost Estimate and bid document preparation) of Park Packages at Ward no. 1,2 and 6 of Gaduwa Rural Municipality, Gaduwa Deukhuri, Dang under Gaduwa Rural Municipality, Gaduwa Deukhuri, Dang.
  • Preparation of Detailed Project Report (Master Plan, Detailed Design and Drawings, Quantity and Cost Estimate and bid document preparation) of Landfill site and Tourism Park at Belauri Municipality, Kanchanpur under Belauri Municipality, Kanchanpur.
  • Preparation of Feasibility Study and Detail Project Report of Tourism spots of Birtamode Municipality under Office of Municipal Executive, Birtamode Municipality.
  • Preparation of Tourism Master Plan of Gajuri Rural Municipality under Gajuri Rural Municipality, Dhading.

Tourism Projects

  • Master Plan of Tourism, Hatuwagadhi Rural Municipality, Ghodetar, Bhojpur,
  • Preparation of Tourism Master Plan of Gajuri Rural Municipality under Gajuri Rural Municipality, Dhading.
  • Preparation of Tourism Master Plan of Salyan under District development Committee Salyan.
  • Preparation of Detail Project Report (Master Plan, Detail Design and Drawings, Quantity and Cost Estimate and bid document preparation) of Park Packages at Ward no. 1,2 and 6 of Gaduwa Rural Municipality, Gaduwa Deukhuri, Dang under Gaduwa Rural Municipality, Gaduwa Deukhuri, Dang.
  • Preparation of Detailed Project Report (Master Plan, Detailed Design and Drawings, Quantity and Cost Estimate and bid document preparation) of Landfill site and Tourism Park at Belauri Municipality, Kanchanpur under Belauri Municipality, Kanchanpur.
  • Preparation of Feasibility Study and Detail Project Report of Tourism spots of Birtamode Municipality under Office of Municipal Executive, Birtamode Municipality.
  • Feasibility Study for Developing the Tourism Place in Bhadrapur Municipality under District Development committee office, Bhadrapur, Jhapa.
  • Preparation of Detail Project Report and Tourism Master Plan (Master plan, Detail Design and Drawings, Quantity and Cost Estimate) of Ranithumka Tourism Spot under Ranithumka, Bangalachuli Rural Municipality, Kamireachaur, Dang.

Feasibility Study

  • Preparation of Feasibility Study and Detail Project Report of Tourism spots of Birtamode Municipality under Office of Municipal Executive, Birtamode Municipality.
  • Feasibility Study for Developing the Tourism Place in Bhadrapur Municipality under District Development committee office, Bhadrapur, Jhapa.
  • Feasibility Study and Detailed Engineering Survey, Design, Cost Estimate, Report Preparation and Construction Supervision of Access Road (20 Km) of Pikhuwa Khola Small Hydropower Project (2.5 MW) Paluwa VDC, Bhojpur District.
  • Feasibility Study and planning for developing of meat production as income
  • Feasibility study/ water way study of Pikhuwa Khola small hydropower project (5MW), Bhojpur District.

Environmental Study (IEE/EIA and other Environmental Study)

  • Initial Environmental Examination (IEE) study and Detailed Cadastral Survey with Mapping of West Seti Transmission Line Project under RPGCL
  • Initial Environmental Examination (IEE) study of sustainable Extraction/Collection of boulder, gravel and sand from the Rivers of Jhapa district (Package-3).
  • Initial environmental examination (IEE) of Dar Kholo Hydropower Project
  • Preparation of Employee Information Management System Initial environmental examination (IEE) of Chepe Hydro- electric Project.
  • Conduction of initial environmental examination (IEE) of Sustainable Extraction/Collection of Boulder, Gravel and Sand from the Rivers of Jhapa (Package-2).
  • Stock Measurement and Projection of harvesting riverbed material from the river systems of Chure-Terai region of Sudurpaschim Province.

Climate Change Project (Adaptation and Mitigation)

  • Readiness Support for the Implementation of the Integrated Result Management Framework (IRMF) for National Trust for Nature Conservation (NTNC): This included a 5-day ToT training and 3-day refresher sessions, training 21 participants in Climate Change and Finance, 40 in Procurement and Contract Management, 21 in Environmental and Social Safeguards (ESS), Integrity, and Gender and Social Inclusion (GESI), 21 in Monitoring and Evaluation, and 34 in Project Development and Proposal Writing. The assignment also involved the revision of 11 policies, development of 3 new policies of NTNC, and the production of a 15-minute video documentary with a photo journal. Green Climate Fund Funded 
  • Conducting Community Workshops for Documenting Local, Traditional, and Indigenous Knowledge on CR-SNRM (Contract No: BRCRN/NCS/RFP/QCBS/01/2081/082) / Green Climate Fund Financing: Provided end-to-end support for BRCRN, including planning and facilitating 105 one-day workshops across 26 river systems. The activities included collecting and documenting local, traditional, and indigenous knowledge on Climate-Resilient Sustainable Natural Resource Management (CR-SNRM), developing detailed workshop materials, conducting field team orientations, ensuring Gender Equality, Disability, and Social Inclusion (GEDSI) compliance, and preparing comprehensive workshop reports. The knowledge gathered was compiled into a compendium and a 30-minute video documentary, highlighting BRCRN’s work in climate-resilient resource management. Green Climate Fund Funded  

Household Metric System

  • Preparation of House Hold Survey (House Numbering) of Bhadrapur Municipality, Ward No 9 and 10 & Previous Chandragadhi VDC Ward No. 08 under Bhadrapur Municipality Jhapa/GON Funded
  • Development of Household Metric System of Gokarneshwor Municipality under Gokarneshwor Municipality Kathmandu/GPN Funded.
  • Development of Household Metric System of Birtamode Municipality under Birtamode Municipality Jhapa/GON Funded.

IT Related Study

  • Design, Develop and Implement ICT- Based Municipal Service Delivery System (Ref No.:01/RFP/ICT/TDF/MFCB/) 79/80)/EU Funded, Expected Date of completion: Dec, 2023.
  • Consulting Services to Design, Conduct and Analyze an End-line Survey on Users Satisfaction with service Delivery by DHM – Contract No. (PPCR/DHM/S/CQS-55) Grant no. TF 013665-NEP Loan no. TF013557/World Bank Funded at Panchthar, Solukhumbhu, Udaypur, Sunsari, Saptari, Mohattari, Chitwan, Lalitpur, Makwanpur, Kaski, Mustang, Dang, Banke, Rupandehi, Jumla, Kailali.
  • Design, development, and deployment of the Enterprise Level Web Based Human Resource Management (HRM) Software under Cinnamon Engineering Pvt. Ltd.,
  • Design and Implementation of Web System for Human Resource Management under Nipuna Prabidhik Sewa (P) ,
  • Design, development and cloud deployment of Web based- Enterprise level of Supply Chain Management E-commerce Web Software under Digital Ocean Pvt. Ltd
  • Design, development and cloud deployment of Web based- Enterprise level of Supply Chain Management E-commerce Web Software under Digital Ocean Pvt. Ltd.
  • Development of Employee Information Management System under Idea Consult Pvt. Ltd.,
  • Preparation of House Hold Survey (House Numbering) of Bhadrapur Municipality, Ward No 9 and 10 & Previous Chandragadhi VDC Ward No. 08 under Bhadrapur Municipality Jhapa/GON Funded,
  • Development of Household Metric System of Gokarneshwor Municipality under Gokarneshwor Municipality Kathmandu/GPN Funded,
  • Development of Household Metric System of Birtamode Municipality under Birtamode Municipality Jhapa/GON Funded,
  • Design and Implementation of Web System for Human Resource Management Compilation and Publication of Irrigation Canal Data/Information Covering 25 pilot districts.

Other Study/ Guideline/Manual

  • Strategy Development for Employment Promotion and Generation at Local Level (Contract No.: NP-MOLESS-251612-CS- CQS-LOCAL MKT STRATEGY”) under Youth Employment Transformation Initiative Project, Ministry of Labor, Employment and Social Security,Sinhadarbar, Kathmandu, Nepal,
  • Development and Application of Climate Field School Model to enable Farmers for Climate Resilient Agriculture Practices (Jhapa District (Garamani, Kumarkhod, Shantinagar, and Jalthal VDCs) under National Agricultural Research and Development Fund (NARDF),
  • Implement Target Poverty Alleviation Program (Developing Mobilization manuals of livestock pocket and farmers groups/co-operatives) in 4 VDCs (Alau, Birgunj, Sub-Metropolitan city, Lakhanpur, and Lappers ) of Parsa District (Micro Financing Training, Pickle Making and Fruit Processing Training, Livestock (Level-1) under Poverty Alleviation PAF, Kathmandu/World Bank Funded.
  • Implement Target Poverty Alleviation Program (Developing Mobilization manuals of livestock pocket and farmers groups/co-operatives) in 7 VDCs (Bangesal, Damri, Khawang, Ligha, Lung, Phopli, Syauliwang) of Pyuthan District (Micro Financing Training, Pickle Making and Fruit Processing Training, Livestock (Level-1) Training) under Poverty Alleviation PAF, Kathmandu/World Bank Funded.
  • Preparing the internal guidelines for Nepal Disabled Association under Nepal Disabled
  • Preparing the internal guidelines for evaluation of sub-proposals and grant request to Nepal Disabled Association (Khagendra New Life Center) by different organization or individuals working on livelihood increment of disabled peoples under Nepal Disabled Association.
  • Data Collection and Analysis to Formulate Low Carbon Development Strategy (LCDS) of Nepal under Climate and Carbon Unit/Alternative Energy Promotion Center (AEPC)/National Rural and Renewable Energy Programme (NRREP).
  • Develop Gender Equality and Social Inclusion Toolbox for Promotion of Renewable Energy Technology under Gender and Social Inclusion Unit/Alternative Energy Promotion Center (AEPC)/National Rural and Renewable Energy Programme (NRREP).
  • Identification of Gender and Social Inclusion Gaps at Policy and Institutional Level under Gender and Social Inclusion Unit/Alternative Energy Promotion Center (AEPC)/National Rural and Renewable Energy Programme (NRREP),
  • Facilitation Support provided for the development of the Strategic Guideline of Eastern Hydropower Ltd.
  • Preparing guidelines for monitoring and evaluation of hygienic local butcher/meat shops in
  • Preparation of Nepal Employment and Skill Training Plan at sankhuwashabha District Arun III Hydroelectric Project Affected Area under SJVN Arun-3 Power Development Company (SAPDC) Private Limited./Indian Government Funded,
  • Third Party Monitoring/Verification of Installed Renewable Energy System-installed in Lumbini, Karnali and Sudurpaschimi Province [(Achham,Baitadi,Bajhang,Bajura,Banka,Bardiya,Dadeldhura,Dailekh,dang,Darchula,Dolpa,Doti,Humla,Jajarkopt,Jumla,Ka ilali,,kalikot,Kanchanpur,Kapilbastu,Mugu,Nawalparasi,Palpa,Pyuthan,Rolpa,Rukum,Rupandhai,Salyan and Surkhet districts.)- Carried out field monitoring/verification of: Solar PV home systems (18 system), Domestic Bio Gas (DBG) (44 systems), Metallic Cooking Stoves (MICS) (61 systems), Rocket cooking Stoves (RCS) (9 systems)] under Alternative Energy Promotion Centre (AEPC),
  • Third Party Monitoring/Verification of Installed Renewable Energy System-installed in Province 1,2, Bagmati and Gandaki province [(Baglung,Bara,Chitwan,Dhading,Dhankuta,,Dhanusha,Dolkha,Gorkha,Illam,Jhapa,Kaski,Kathmandu,Kavrepalanchowk,La litpur,Lamjung,Mohattari,Makanpur,Morang,Myagdi,Nuwakot,Okhaldhunga,Panchtar,Parbhat,Parsa,Ramechhap,Rautaha t,Sankhuwasha,Sapatari,Sarlahi,Sindhuli,Sindhupalanchowk,Sunsari,Syangja,Tanahu,Taplejung and Udhayapur districts.), Carried out field monitoring/verification of: Solar PV home systems (3 system),Domestic Bio Gas (DBG) (169 systems),Metallic Cooking Stoves (MICS) (56 systems),Rocket cooking Stoves (RCS) (123 systems)] under Alternative Energy Promotion Centre (AEPC),
  • Consulting Services to Design, Conduct and Analyze an End-line Survey on Users Satisfaction with service Delivery by DHM – Contract No. (PPCR/DHM/S/CQS-55) Grant no. TF 013665-NEP Loan no. TF013557/World Bank Funded at Panchthar, Solukhumbhu, Udaypur, Sunsari, Saptari, Mohattari, Chitwan, Lalitpur, Makwanpur, Kaski, Mustang, Dang, Banke, Rupandehi, Jumla, Kailali,
  • Mid-Term Review DFID Nepal’s Accelerating Investment and Infrastructure In Nepal (AiiN) under Landell Mills.
  • Consulting Service for programme Completion Survey (CPS) Program Completion Report at 5 districts of Lumbini Province: Arghakhachi, Gulmi, Pyuthan, Rolpa and Rukum East /2 Districts of Karnali Province: Rukum West and Salyan (includes household survey of 3000hhs) under Landell Mills Ltd.
  • Conduct Baseline and Knowledge, Attitude and Practices (KAP) Survey for Building livelihood resilience and nutrition security in Kamala River Basin, Siraha district, Nepal under Forum for Rural welfare and Agricultural Reform for Development (FORWARD Nepal), Siraha.
  • Third- Party Monitoring/Verification of Installed Renewable Energy Systems in 12 District (Lot-5) in 12 Districts of Nepal – (Makwanpur, Parsa, Bara, Rautahat, Sarlahi, Mohattari, Dhanusa, Siraha, Saptari, Udayapur, Sunsari, Morang) under Alternative Energy Promotion Centre (AEPC), National Rural and Renewable Energy Programme (NRREP)/Various Donor Agency Funded, Kathmandu.
  • Third- Party Monitoring/Verification of Installed Renewable Energy Systems in 11 District (Lot -6) in 11 Districts of Nepal – (Rasuwa, Dhading, Nuwakot, Kathmandu, Bhaktapur, Lalitpur, Kavrepalanchok, Sindhupalchok, Dolkha, Ramechhap, Sindhuli ) under Alternative Energy Promotion Centre (AEPC), National Rural and Renewable Energy Programme (NRREP)/Various Donor Agency Funded, Kathmandu, (2017).
  • Third- Party Monitoring/Verification of Installed Renewable Energy Systems (Lot-7) in 11 Districts of Nepal – (Solukhumbu, Okhaldhunga, Khotang, Bhojpur, Sankhuwasabha, Dhankuta, Terathum, Taplejung, Panchthar, Ilam and Jhapa) under Alternative Energy Promotion Centre (AEPC), National Rural and Renewable Energy Programme (NRREP)/Various Donor Agency Funded, Kathmandu.
  • Baseline Preparation for Rural and Renewable Energy Related National Development Indicators (NDIs) and other indicators related to NRREP under Monitoring and Quality Assurance Unit/ Alternative Energy Promotion Center (AEPC)/ National Rural and Renewable Energy Programme (NRREP).
  • Identification of Gender and Social Inclusion Gaps at Policy and Institutional Level under Gender and Social Inclusion Unit/Alternative Energy Promotion Center (AEPC)/National Rural and Renewable Energy Programme (NRREP).
  • Baseline preparation for employment generation through the agricultural cooperatives. (Identification and preparation of strategies for livestock market) under Mechinagar Municipality, Jhapa district.
  • Data Collection and Analysis to Formulate Low Carbon Development Strategy (LCDS) of Nepal under Climate and Carbon Unit/Alternative Energy Promotion Center (AEPC)/National Rural and Renewable Energy Programme (NRREP).
  • Baseline Survey and preparation for employment generation through the agricultural cooperatives. (Identification and preparation of strategies for livestock market) under Birtamode Municipality Office.
  • Impact Assessment of Piloted District Climate and Energy Plans (DCEPs) at Ilam, Makwanpur and Mustang district.
  • Development and Application of Climate Field School Model to enable Farmers for Climate Resilient Agriculture Practices (Jhapa District (Garamani, Kumarkhod, Shantinagar, and Jalthal VDCs) under National Agricultural Research and Development Fund (NARDF).

Hydropower Projects

  • Detailed Engineering Survey, feasibility study, design and cost estimation of Sisne Khola hydropower project (750 KW) in Dobhan VDC, Palpa district.
  • Feasibility study/ water way study of Pikhuwa Khola small hydropower project (2.5MW), Bhojpur District.
  • Detailed Design and Construction Supervision of Siddhikhola Hydropower Project (10MW), Expected Completion Date- Aug 2024.

Water Supply and Sanitation Projects

  • Changu Water Supply and Sanitation Project, under Rotary Club.
  • Detailed Engineering Survey and Design Report Preparation of Lakila Water Supply and Sanitation Project in Changunarayan Municipality-03, Bhaktapur District, under Provincial Government, Ministry of Physical Infrastructure Development, Province No-3, Water Supply and Sanitation Division Office, (Project Cost- NRs.63.85Million approx.).
  • Survey, Design Cost Estimate and Study Report Preparation of Dhakedbas – Mattikhan Water Supply Project “Fedi Khola Rural Municipality -1,4, Syangja” under Provincial Government, MOIPT, WSS Office, Shyangja.
  • Detailed Engineering Survey and Design Works of Jugekhola Lekhani Water Supply Project, Baramase Bilimla Water Supply project and Ranakhola Water Supply Project (Project Cost- NRs.69.5 Million, 55.7 Million and 76.45 Million approx.) under DWSS, Water supply and Sanitation Division, Gaighat, Udaypur.

Agricultural Sector

  • Development and Application of Climate Field School Model to enable Farmers for Climate Resilient Agriculture Practices (Jhapa District (Garamani, Kumarkhod, Shantinagar, and Jalthal VDCs) under National Agricultural Research and Development Fund (NARDF).
  • Implement Target Poverty Alleviation Program (Developing Mobilization manuals of livestock pocket and farmers groups/co-operatives) in 4 VDCs (Alau, Birgunj, Sub-Metropolitan city, Lakhanpur, and Lappers ) of Parsa District (Micro Financing Training, Pickle Making and Fruit Processing Training, Livestock (Level-1) under Poverty Alleviation PAF, Kathmandu/World Bank Funded.
  • Implement Target Poverty Alleviation Program (Developing Mobilization manuals of livestock pocket and farmers groups/co-operatives) in 7 VDCs (Bangesal, Damri, Khawang, Ligha, Lung, Phopli, Syauliwang) of Pyuthan District (Micro Financing Training, Pickle Making and Fruit Processing Training, Livestock (Level-1) Training) under Poverty Alleviation PAF, Kathmandu/World Bank Funded.